CASE STUDY

Trinity Chapel Apartments

Project Overview
A new build development of 20 modern, Assisted Living apartments, in the heart of Workington
The building is of timber frame construction, built onto the back of an original stone Victorian façade, preserving the visual appearance of the town centre, but allowing high levels of insulation to be incorporated into the build.
The Brief

The client wanted the new development to incorporate the latest developments in both technology and sustainability. To achieve this, our KERS Indoor Heat Pump MEV were incorporated into each apartment, taking stale warm air from each kitchen & bathroom and processing it through our Heat Pump. Absorbing the waste heat. Our heat pump also satisfies the Ventilatiin requirements within each property.

By also using high levels of insulation in the building, it is anticipated that utility costs for the development will be considerably reduced.

The Solution

NEED SOME MEAT IN HERE

The Results

ALSO SOME MEAT IN HERE

KERS Innovations technologies reduce your bills and divert wasted energy back into your business. Good for the environment, good for your bottom line.