The Plan
When Hurstwood Environmental were appointed the M&E Design on this project, they reached out to KERS to include their products in the design and strategy. Planning was submitted utilising the KERS Weatherby HP along with electric radiators and MVHR for Heat Recovery
The client wanted an energy-efficient design that would cut operating costs,support long-term sustainability, but to be achieved within a strict budget. This posed a challenge. Too often, energy efficiency comes with a higher upfront cost, making it difficult for projects to balance sustainability goals with financial constraints.
The Challenge
The Solution
Collaboration, Innovation, and Eco-Sensitive Product Choices
2. Use of MVHR (Mechanical Ventilation with Heat Recovery)
The Outcome
The completed scheme achieved a high EPC rating, showcasing excellent thermal performance, efficient systems, and low predicted energy consumption. By adopting an all-electric approach including electric heating, MVHR, and the Weatherby product the development dramatically reduced reliance on fossil fuels. This not only cut carbon emissions but also aligned the project with future regulatory trends towards net-zero carbon.
In operation, the building delivers tangible benefits for residents and owners alike. Energy bills are lower thanks to efficient systems, while operational maintenance requirements are reduced because simpler electrical systems replace complex dual-fuel or fossil-fuel solutions. Importantly, the project was delivered within the client’s budget, proving that strong environmental credentials and high performance can be achieved without overspending when early planning, close collaboration, and the right product choices are in place.